久久久91精品国产一区二区三区|亚洲中文无码卡通动漫|国产AV国片精品无套内谢无码|国产99久久久国产精品电影|

The Annual Equipment of Pipeline and Oil &Gas Storage and Transportation Event
logo

The 26thBeijing International Exhibition on Equipment of Pipeline and Oil & Gas Storage and Transportation

ufi

BEIJING, China

March 25-27,2026

LOCATION :Home> News> Industry News

Gas pipeline from Turkmenistan to China to be completed in 2016

Pubdate:2014-10-23 11:36 Source:yueyue Click:

The construction of the 4th branch (D) of the Turkmenistan-China gas pipeline is planned to be completed in 2016, Turkmen President Gurbanguly Berdimuhamedov said Oct. 21.

President Berdimuhamedov made the remarks while delivering a speech at a meeting of the Council of Elders, the Neutral Turkmenistan newspaper said.

The China National Petroleum Corporation, or simply CNPC, has been buying gas from the Central Asia since 2009 after the launch of the first two branches of the pipeline (A and B) running from Turkmenistan through Uzbekistan and Kazakhstan.

The third branch (C) of the gas pipeline has been launched recently along the same route.

Chinaand Turkmenistan have an agreement to boost deliveries by 2020 to 65 billion cubic meters of gas, and to this end the additional fourth branch (D) is constructed through Uzbekistan, Tajikistan and Kyrgyzstan.

The D branch is about 1000 kilometers long. It starts at the border of Turkmenistan and Uzbekistan, runs through Uzbekistan, Tajikistan and Kyrgyzstan, and goes to China.

Some 410-kilometer stretch of the gas pipeline will run from west to east through Tajikistan, 93 percent of the surface of which is a mountainous area.

In this regard, the construction process faces many difficulties, since the pipeline will run through 47 percent of rivers and 76 kilometers of tunnels.